Jan 16, 2017
Underground Structure Waterproofing
1、Top Waterproof; 2、Side Wall Waterproof; 3、Bottom Floor Waterproof.
1.Drain Pipe;
2.Shotcrete Layer;
3.PVC Waterproof Floor;
4.Geotextile Butter Layer (400g/m2) fixed by gasket;
5.Protection Layer(recycle materials);
6.Concrete Construction;
7.Protection Layer(Detailed operation ways please do it under drawings.
6、≥1.2mm(thickness) High Polyer Self-adhesive Waterproof Sheet(Only for Bottom Floor)
For More Detail please contact:
Demi Liang (Sales Manager)
Skype: demi19901130
What's app: 0086 15269666784
Wechat: liangxin4570
QQ:476707771
Tel: +86-532-87851517
Fax: +86-532-87851517
Mobile: +86-15269666784
E-mail: manager@goldenwaterproof.com
+86-536-5513806
Taitou Industrial Zone, Shouguang City, Shandong Province, China